Section 05 · Case studies

The record we can show today.

Every case below is drawn from an actual deployment or a modeled site engineering study. Where a number is modeled, it says so, in the same weight as the number itself. As pilots complete and clients allow us to name them, the models are replaced by the record.

Filter

Eight sectors, one library. Jump to the sector that matches your site, or read them all in order.

  1. Plate 01 · Warehousing & 3PL
    −78%
    Modeled unauthorised entries across pilot yards

    A Pune 3PL operator — pallet loss on the night dock

    Six-figure monthly pallet shrinkage traced to a fifteen-minute window between shift handovers. Rakshak's overnight patrol produced timestamped footage of the exact door, the exact truck, the exact person. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  2. Plate 02 · Solar
    ₹Cr
    Modeled equipment loss prevented per site, per year

    A 14-site solar operator in western India

    Recurring copper theft across widely separated substations. Rakshak deployed docked units at three highest-loss sites; incident count dropped and — more useful — the recorded trail turned insurance claims from disputed to settled. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  3. Plate 03 · Power & Transmission
    3.4×
    Modeled faster detection vs. scheduled foot patrol

    A state transmission utility pilot

    One remote 220kV substation, three months of overnight autonomous cover. Detection latency for perimeter events fell to under a minute against a scheduled patrol baseline measured in hours. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  4. Plate 04 · Manufacturing
    24 / 7
    Continuous perimeter cover regardless of shift

    A tier-one auto supplier, southern India

    After a scrap-theft incident that was never resolved because no one could produce a coherent record, plant security added Rakshak overnight. First month: two attempted incursions, both captured end-to-end. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  5. Plate 05 · Mining
    500+ ha
    Single-unit modeled coverage per shift

    A limestone quarry, central India

    Recurrent after-hours intrusions across a twelve-kilometre perimeter that took three-guard rotations to nominally cover. Rakshak replaced the nominal with the actual. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  6. Plate 06 · Ports
    < 60 s
    Modeled detection-to-alert latency on quay-side incursions

    A major east-coast container terminal — pilot

    Waterline blind spot that existing CCTV could not see. A single Rakshak unit closed the gap, and produced the first coherent night-time record of a stretch of quay the security team had not been able to watch continuously. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  7. Plate 07 · Airfields
    IP54
    Weather-hardened for continuous outdoor operation

    A regional airport perimeter study

    Boundary length, existing patrol arithmetic, and modeled autonomous coverage compared against a fixed guard baseline. The number that changed the conversation: how long a perimeter breach could persist before anyone saw it. Modeled outcome · site engineering assumptions.

    Sector page →TODO: replace with real named client quote before launch.
  8. Plate 08 · Defence
    In-country
    Design, assembly, on-board processing, data control

    Defence conversations — Phase 3

    Rakshak is deliberately building the operational record on critical civilian infrastructure first. Defence engagements begin once that record is real, not on the promise of it.

    Sector page →TODO: replace with real named client quote before launch.
Next step

Two weeks. One gate. A signed decision date.

A scoped, paid evaluation at a single zone or gate you choose, alongside your existing guards and CCTV. Success criteria, decision date, and contract price are agreed in a short evaluation agreement before we deploy. The deployment fee is credited in full against your first-year contract if you move forward. We run a limited number of evaluations per quarter.